CAN DAM AND  HEPP

CAN DAM AND HEPP

The Construction of Can Dam and Hepp, which is located in Beytüşşebap/Şırnak is planned t o be started in 2016. The targeted average annual yield is 204.000.000 kWh with 85 MW installed power.

Project Name:Can Dam and Hepp

Investor: Bayraktar

City: Şırnak

Date: 2016

Installed Power and Annual Yield: 85 MW / 204.000.000 kWh