Çiftlik Solar Power Plant, which is located in Kayseri Melikgazi has an installed capacity of 10 MW, the targeted average annual yield is 19.000.000 kWh. The plant is in operation since January 2016.
Project Name: Çiftlik Solar Power Plant
Investor: Bayraktar
City: Kayseri
Date:2016
Installed Power and Annual Yield: 10 MW /19.000.000 kWh