Güneşli II Diversion Weir and HEPP, which is located in Of/Trabzon, is in commercial operation since July 2013.An average annual yield of 45.000.000 kWh has been reached with 12.6 MW installed power.
Project Name: Güneşli II Regülatörü ve Hes
Investor: Bayraktar
City: Trabzon
Date: 2013
Installed Power and Annual Yield: 12.6 MW / 45.000.000 kWh